One Month Before High-Speed SkyWay Premiere

One Month Before High-Speed SkyWay Premiere

17 August 2018

It remains only about a month before the presentation of the first industrial sample of the high-speed SkyWay unibus capable of accelerating to 500 km/h speed. The way it can be has been repeatedly demonstrated in various kinds of presentations, which were numerous during the decades of the project development. The way it will be is one of the main intrigues of the trade fair InnoTrans 2018 (in Russian) to be held in Berlin from 18 to 21 September. However, some details regarding this development were revealed to investors at this year’s EcoFest.

 

Features and Prospects

High-speed SkyWay is one of the most ambitious trends in technology development. 500 km/h at a height of several meters above the ground, with maximum comfort and safety. Overcoming immense distances in a matter of hours at a fair often even lower than on a railway. Given that the cost of building such a system will be tenfold lower than the cost of building any of the high-speed railroads existing in the market today, and energy consumption at maximum speed limited to only 8 liters per 100 kilometers in fuel equivalent, a ticket for Minsk – Moscow route will cost about 30 USD, and the travel will take only about an hour and a half, during which a passenger will stay in a soft ergonomic chair. It is against 50 USD and 9 and a half hours in a stuffy economy class sleeping car offered as a transportation service today. As they say, feel the difference.

At InnoTrans 2018, the difference between the transport of the past and the transport of the future will be felt literally, being among the first visitors to test the cabin of a high-speed module and to evaluate its innovative design that provides a truly fantastic aerodynamic drag factor: Cx = 0.06, which approaches the theoretical maximum and surpasses similar rates at the fastest and most expensive sports cars by at least five times.

In addition to their basic function, high-speed transportation systems will become a powerful stimulus for social and economic development in the near future. They will significantly increase mobility opportunities, accelerate trade turnover, serve as a basis for the development and expansion of power and information networks, while not damaging the ecology of the territories, in which it will be built, but, on the contrary, making a significant contribution to improve the situation both locally and globally through energy efficiency. Linear cities will be set up along the routes. They will be created with a fundamentally different logic than the present settlements – pedestrian, clean, affordable, safe and comfortable for living. The outlines of all this can be seen in the configuration of the high-speed module already on September 18. It was expected that this system would show itself in action soon, however, this moment is a little delayed. But not for long.

SkyWay, Sky Way, SkyWay in Belarus Yunitsky, string transport, high-speed, hyper-u, Innotrans 2018, Premiere

 

Test tracks

As the General designer Anatoly Yunitskiy said in his report at EcoFest 2018, it is planned to build a high-speed track with a length of at least 25 km needed to achieve the declared speeds in the UAE. This has not happened yet in Belarus, where the engineer planned to launch such a construction two years ago, so that by now it could have been close to completion, if not ready. Officials of the republic refused to allocate land, referring to the fact that the arguments from SkyWay are unconvincing, because a lot of valuable tree species will be cut along the swamp where the route will pass, and a large number of birds will allegedly perish from the movement of a high-speed unibus. And this is despite the fact that the project designing organization has passed all the required bureaucratic procedures, collected 16 approvals ranging from power engineers and communication operators to firefighters and environmentalists.

On the contrary, officials, to be more precise, the UAE government, was able to consider the prospects of SkyWay and supported the project understanding that among the transport solutions offered today only Yunitskiy’s SkyWay Transport is able to provide the level of economy, environmental friendliness and safety that will meet future challenges in this area and will be able to set a new standard for the future.

According to Anatoly Yunitskiy, the Emirates’ government has already confirmed its words by deeds, allocating for free a total of more than 50 hectares of land, worth of hundreds of million dollars in the market for two technological sites of SkyWay, one of which has the required length (25 km), where Anatoly Yunitskiy plans to reach up to 600 km/h speed, with the extension of the route to 60 km, where the Hyper U forevacuum tube with designed speed of 1,250 km/h will be built soon!

 

Higher, higher ... hyper!

Anatoly Yunitskiy began to work out the idea of Hyper U project announced at EcoFest 2018 for the first time more than 40 years ago – since the 70s of the last century, even before the invention of SkyWay. All technical solutions have already been created over these years, and it will be another breakthrough transport technology, but fundamentally different from Hyperloop. Back in 1995, the inventor described it in detail in his monograph “String Transport Systems: on Earth and in Space”:

“At speeds of over 200 meter per second (720 km/h), the transport system should be placed in a special tube of 2-3 m in diameter, from which air is pumped out. The tube can be located both above and below the ground, as well as under water at a depth of 10-100 meters, so as not to interfere with navigation and not to be exposed to the destructive impact of storms.”

In the offshore area, arrangement of such a route is assumed in a submarine tube-tunnel made with zero buoyancy, since the impact of destructive storms is excluded at such a depth. To bypass powerful ocean currents, the tunnel can go down to a greater depth. In order to provide the tunnel with extra buoyancy, in other words, to prevent flooding of the tube under the influence of a mobile load, special floats anchored at the seabed are used. It is interesting that, taking into account low material intensity and rare installation of anchor pulls – at distances from 100 m to 10 km from each other – the depth of the sea is not of fundamental importance to the cost of the transport system! Submarine float stations made with high extra buoyancy, perform the role of anchor supports in this case. Smaller in size intermediate supports can be arranged inside a tube-tunnel made of steel or pre-stressed reinforced concrete having an internal diameter of 2.5-3 m. It is stretched in the longitudinal direction, therefore it is a pre-stressed structure and works as a string.

At the present stage of developing hyper-speed transport by Anatoly Yunitskiy, the limit of systems perfection is pushed even further than it was described by him in 1995. However, premieres of Hyper U industrial prototypes and speed records over 1,000 km/h is a matter of the future, albeit not too remote one. The first sample of the high-speed SkyWay rolling stock capable of accelerating up to 500 km/h is the today’s reality, construction of a 25-kilometer route for it is tomorrow’s day, which will come very, very soon, and after which the concept of “transport” will acquire a new meaning.

Consent Request Form

This form asks for your consent to allow us to use your personal data for the reasons stated below. You should only sign it if you want to give us your consent.


Who are we?

The name of the organisation asking you for consent to use your information is:

Global Transport Investments
Trident Chambers, P.O. Box 146, Road Town
Tortola
British Virgin Islands

We would like to use the following information about you:

Why would we like to use your information?

Global Transport Investments would like to send this information to company registry, inform you about its news, for refund purposes.


What will we do with your information?

We store your name, address, ID Data, date of birth into company registry. We will share your e-mail & phone number with IT Service (https://digitalcontact.com/), SMS Center (http://smsc.ru). They will add your details to their mailing list and, when it is news update, they will send you an email or sms with details. We store your credit card number for possible refunds.


How to withdraw your consent

You can withdraw the consent you are giving on this form at any time. You can do this by writing to us at the above address, emailing us at the address: [email protected] or by clicking on the unsubscribe link at the bottom of emails you receive.

Privacy Notice – Newsletter Signup

This privacy notice tells you about the information we collect from you when you sign up to receive our regular newsletter via our website. In collecting this information, we are acting as a data controller and, by law, we are required to provide you with information about us, about why and how we use your data, and about the rights you have over your data.


Who are we?

We are Global Transport Investments. Our address is Trident Chambers, P.O. Box 146, Road Town, Tortola, British Virgin Islands. You can contact us by post at the above address, by email at [email protected].

We are not required to have a data protection officer, so any enquiries about our use of your personal data should be addressed to the contact details above.

What personal data do we collect?

When you subscribe to our newsletter, we ask you for your name and your email address.

Why do we collect this information?

We will use your information to send you our newsletter, which contains information about our products.

We ask for your consent to do this, and we will only send you our newsletter for as long as you continue to consent.


What will we do with your information?

Your information is stored in our database and is shared with with IT Service (https://digitalcontact.com/), SMS Center (http://smsc.ru). It is not sent outside of the Euro. We will not use the information to make any automated decisions that might affect you.


How long do we keep your information for?

Your information is kept for as long as you continue to consent to receive our newsletter.


Your rights over your information

By law, you can ask us what information we hold about you, and you can ask us to correct it if it is inaccurate.
You can also ask for it to be erased and you can ask for us to give you a copy of the information.

You can also ask us to stop using your information – the simplest way to do this is to withdraw your consent, which you can do at any time, either by clicking the unsubscribe link at the end of any newsletter, or by emailing, writing us using the contact details above.


Your right to complain

If you have a complaint about our use of your information, you can contact the Information Commissioner’s Office.