SkyWay EcoTechnoPark: Installation of Trusses

21 November 2016 1315

The contractor has started the process of assembling trusses on the track structure at the urban/high-speed SkyWay route. In order not to impede the work of the team engaged with the construction of the passenger station (transport and logistics hub combined with the terminal anchor support), installation of metal structures was started on the second 50-meter span. After the trusses will take their places all over the kilometer line, the track structure will receive the designed tension; however, the tests of the system will begin before that. In order to obtain additional data on the impact of dynamic and static loads on the system, a 14-passenger urban unibus will pass along the rails. The developers plan to start testing before the end of this month.

Tags
Evgeny Petrov

Editor in chief of information services for international group of companies SkyWay, specialist in philosophy of science and technology

Latest news

Copyright © Rsw-systems.com, Inc.