Photo report from EcoTechnoPark dated March 4

04 March 2016 937

Designer supervision. Inspection of reinforcement for the diaphragm on the first floor of the SkyWay transport and logistics hub, combined with the terminal anchor support – no deviations from the project documentation have been found. Removal of formwork from the stiffness diaphragm on the northern wall, arrangement of formwork on the southern wall of the first floor. Inspection of diaphragm structures after the removal of formwork. Checking of the site diary and certificates to concrete mixture.